News Product Company
Home News Center Product Center Company Directory Inquiry List
News Center >> China News >> First bleed air system for the C919 engine test bench delivered
March 04 , 2014 Tuesday

First bleed air system for the C919 engine test bench delivered

After having been selected to develop, manufacture, qualify and certify the integrated air management system for the C919 single-aisle aircraft in 2010, Liebherr-Aerospace recently delivered the first bleed air system to Chinese aircraft manufacturer COMAC.

The system consists of bleed valves, a pre-cooler, a heat exchanger, high-pressure ducting and corresponding pressure and temperature sensors, which are connected with a bleed monitoring controller. It will be used for the test-driven development of the engine LEAP 1C manufactured by CFM.

Measuring equipment has been fitted on these components, which were designed to withstand thermal and mechanical requirements of the new-generation engine. Thus, COMAC and Liebherr-Aerospace will receive information on the behavior of the bleed air system during the engine tests.

The next step for Liebherr-Aerospace will be the delivery of additional components for the engine ground and vibration test benches to prepare the flight test campaign of the C919.

Liebherr-Aerospace supplies the air management system and the landing gear system for the C919.

Source: www.liebherr.com

Featured »

Copyright © 2002-2024 cmsou.com Construction Machinery Online. All rights reserved. 北京摩迅筑路机械有限公司 About Us

Address: Room 901, Building C, Ruipu Mansion, Hongjunying South Road No.15, Chaoyang District, Beijing.100107 P.R.China

E-Mail: webmaster@cmsou.com TEL: 0086-10-52895329 FAX:0086-10-84673349 Site Map | Brand | Products

京ICP备09081701号-19